Crib Point Jetty - Port of Hastings (2010). This was built in 1966 for $7m and included a two-berth marine terminal with capacity for tankers up to 100,000 tons - Tyabb Airport fotogalleri på Panoramio

Vis enkeltside Fotogalleri Tyabb Airport
Vis opprinnelige bildet (nytt vindu)
Muzza from McCrae, 27 August 2010